Professional suggestion: 3 or four passes With all the bull float is often adequate. Far too much floating is a typical concrete pouring error that may weaken the surface area by drawing up far too much water and cement. Post-construction, the main target shifts to keeping the structure to ensure https://eduardogtdlq.ttblogs.com/16824421/engineered-concrete-specialists-delivering-durable-results-across-new-zealand