Scheduling is part of the decision. An urgent fault and a planned upgrade should not be written as if they take the same slot.
Local availability of parts changes the timeline. A page that pretends every part is already https://talonshieldsnorthbayepox595112.blogdon.net/notes-on-flooring-for-a-careful-reader-after-a-breakdown-59841134